The framing for the addition at the basement level and main level is well underway. The contractor has put a tarp over the addition and the areas where the existing roof has been removed. The entire existing roof will eventually be removed and the second floor framing will begin very soon.

This week the window order is being reviewed as well as bids for cabinets and tile work.