Friday, November 13, 2009

Great Progress



The building system “rough-in’s” have been moving right along and this week. The heating and ventilation contractor, the electrician and the plumber have been hard at work routing the new systems for the house. The owners and the contractor have been meeting weekly in order to keep everything moving along as smoothly as possible.

The window installation was also underway this week. Most of the installation looks pretty straight forward, but the new dining room window will be the biggest picture window that is made by Milgard. Not to make things easier, but the installation will be on the tallest part of the exterior. How many guy’s does it take to put in an 11’ wide x 4 1/2’ tall window? This window will be one story above where the original picture window looked out toward Elliot Bay and Downtown Seattle.

With the temporary plastic removed from the window openings, downtown Seattle will be in direct view when working from the kitchen area.